Search

TPL_SPARKLE_LOGO

Projects

Participation in infrastructure construction for technology leader and owner, in a project for assembling several distillation modules of tequila with a production capacity of 30,000, 20,000 and 15,000 liters / hr., including the installation of mechanical and electrical services for the implementation column. Participation in infrastructure construction in building infrastructure for recovery of alcohols in fermentation and CO2 washing tanks.

Construction and mounting of mechanical infrastructure as mixers for soap, pots, soap cutters, mounting of five production lines for toilet and laundry soap in coordination with the customer and the company MAZZONI.

Design and construction of infrastructure for storage tequila, with capacities from 220,000 liters up to 500,000 liters, with stainless steel T-304. Also were considered accessories, process piping, services and aerial walkways, always meeting TIG (GTAW) processes as well as ASME and API codes and norms employing qualified welders. Design and construction of infrastructure to deliver services steam, condensate, mains water, ice water and return, wort, vinasse, tequila, electrical connection, programming control system service and resection of finished product distillation column with production capacity of 30,000 liters / hour. Design and construction of agave oven doors for guaranteeing zero vapor leaks and easy opening. Design and construction of infrastructure for the discoloration of tequila project, with capacity of 25,000 liters.

Construction of electrical infrastructure for deep well pump with 440 volts reduced voltage starter and local control, also installation of four (4) 400 watts lamps with 220 VAC at 7 feet tall pole. Construction of electrical infrastructure replacing self-supported Federal Pacific (f Power) distribution board at a substation plant for tequila.

Construction of infrastructure for capacity expansion project in the milk storage area which consisted of the removal of 2 low capacity silos and installation of 2 new silos with capacity of 125,000 liters, considering sanitary pipes and fittings such as 4 Port Alfa-Laval valves.


Construction of infrastructure for liquefied processes with Fristan brand supplies. Construction of infrastructure for 70S-5 machine installation project, considering service pipes and accessories in general. Construction of infrastructure for the new TETRA PACK pasteurizer working together with the company ALFA LAVAL, including balance tub pipes and process service. Construction of infrastructure for the project to raw milk silo with a capacity of 150,000 liters including all accessories process connection. Design and construction of infrastructure for secure downloading project, through air corridors to ship to discharge pipes. Construction of infrastructure for Fristan project, which considered various sections conveyor making for the packaging area as plant needs.

Construction of infrastructure for the proposed overhaul and modification in plant grains, for the installation of new machinery, designing and building conveyors, chutes, ducts and equipment rearrangement according to requirement of the project.

Construction of infrastructure for OMEGA plant I and II, making process piping and overall service following indications of project plan leader.

Design and construction of infrastructure for OMEGA III and IV plant project, taking into consideration structures, equipment assembly by technology owners, mechanics and service process piping as well as the startup and commissioning of this plant for product (Isadora) in coordination with the client and SELO and LAGARDE companies.

Construction of infrastructure for the project consisting of the assembly of DUOCLEANERS for cleaning paper machine number II. Conducts corrective and preventive maintenance on the whole plant. Manufacture of machined mechanical parts, required for corrective maintenance of the plant.


Maintenance of production equipment as hydraulic, pneumatic, and mechanical stamping, importing parts from origin countries as required by the metal mechanical industry. Design and construction of infrastructure for the installation of two overhead cranes in reception area for steel tools and plastic box factory.

Construction of infrastructure for the project of ejectors and cooling chambers at high vacuum with food grade. Construction of infrastructure for the project of fryers line with a capacity of 2,500 liters of oil considering power, utility pipes, control and peripheral equipment.

Construction of infrastructure for the structural design for installation of the new non-returnable line of beer in conjunction with KHS company. Construction of infrastructure for the project CO2 washer 4,000 lb / HR as well as the carbon dioxide system, CIP and washer tower considering pipes and fittings in accordance to plant engineering. Construction of infrastructure for CCM mounting project, consisting of 30 KVA transformers and power supply to pumps and fans for Casta beer plant at GDL project. Design and construction of infrastructure for the relocation of service lines such as; process water, chilled water supply and return air, CIP system and air drainage because they interfered in the modernization and construction of house brews called "LIBRANZAS STEINCKER". Supply of competent personnel to perform routine maintenance to the plant for 180.000 hours, fulfilling the needs of the requested staff competence. Construction of infrastructure for the project of decommissioning of the whole obsolete transportation system as well as the installation of the new conveyor system MAY MILO, including disassembly and assembly of equipment and SCFM ROOTS blower 50hp, vibrating discharger, locks, rotary valves, manifold powder hopper depressurization worm conveyor and hopper scale. Design and construction of infrastructure for the project platform and lifeline in the cargo area of filter sludge and yeast sales. Construction of infrastructure for the project water treatment by osmosis, project named SAAM'S for which the capacity was increased, considering complete piping installation in internal path plant in 10 ", 8", 6 ", 4", 2 "and 1" T-304 stainless steel and pipe fittings and equipment. Construction of infrastructure for the GDL 300 Aldox project which consisted on bringing services to ALFA LAVAL equipment and ammonia trap with carbon steel pipes C-80 10 "and 8" diameter for ammonia, pipes DN80 - DN25 in stainless steel T- 304 for deaerated water and other services based on project scope. Construction of infrastructure for the project 75 tons CO2 horizontal container, considering installation of high pressure pipes for interconnecting the current process according to project needs.


Construction of infrastructure for Interlocks Project at Atequiza, Jal,. considering electrical and mechanical piping for the project, as well as installation oxygen sensors, PSL, and INTERLOCKS controlled from CCM to 10 teams located in different areas of floor plan, all with explosion proof material under engineering plant. Design and construction of infrastructure for the NCP III project considering manufacturing and growth of TOLUENE storage tanks with capacities from 20,000 to 30,000 liters in full stainless steel T-316 with accessories, process piping and services, complying with TIG (GTAW) as well as ASME, API norms, employing certified welders, electrical piping and CCM connection (SQUARE D brand) for column sensors, and peripheral PLC boards located in various areas of the plant, all used material was explosion proof .

Maintenance work at oxygen and nitrogen plant, which consisted of removal and construction of new interchanger for the After Cooler compressor system, also connecting service pipe of 14 "and 6" diameter using carbon steel schedule 40, seamless and ready for radiographic inspection.