Maintenance of production equipment as hydraulic, pneumatic, and mechanical stamping, importing parts from origin countries as required by the metal mechanical industry. Design and construction of infrastructure for the installation of two overhead cranes in reception area for steel tools and plastic box factory.

Construction of infrastructure for the project of ejectors and cooling chambers at high vacuum with food grade. Construction of infrastructure for the project of fryers line with a capacity of 2,500 liters of oil considering power, utility pipes, control and peripheral equipment.

Construction of infrastructure for the structural design for installation of the new non-returnable line of beer in conjunction with KHS company. Construction of infrastructure for the project CO2 washer 4,000 lb / HR as well as the carbon dioxide system, CIP and washer tower considering pipes and fittings in accordance to plant engineering. Construction of infrastructure for CCM mounting project, consisting of 30 KVA transformers and power supply to pumps and fans for Casta beer plant at GDL project. Design and construction of infrastructure for the relocation of service lines such as; process water, chilled water supply and return air, CIP system and air drainage because they interfered in the modernization and construction of house brews called "LIBRANZAS STEINCKER". Supply of competent personnel to perform routine maintenance to the plant for 180.000 hours, fulfilling the needs of the requested staff competence. Construction of infrastructure for the project of decommissioning of the whole obsolete transportation system as well as the installation of the new conveyor system MAY MILO, including disassembly and assembly of equipment and SCFM ROOTS blower 50hp, vibrating discharger, locks, rotary valves, manifold powder hopper depressurization worm conveyor and hopper scale. Design and construction of infrastructure for the project platform and lifeline in the cargo area of filter sludge and yeast sales. Construction of infrastructure for the project water treatment by osmosis, project named SAAM'S for which the capacity was increased, considering complete piping installation in internal path plant in 10 ", 8", 6 ", 4", 2 "and 1" T-304 stainless steel and pipe fittings and equipment. Construction of infrastructure for the GDL 300 Aldox project which consisted on bringing services to ALFA LAVAL equipment and ammonia trap with carbon steel pipes C-80 10 "and 8" diameter for ammonia, pipes DN80 - DN25 in stainless steel T- 304 for deaerated water and other services based on project scope. Construction of infrastructure for the project 75 tons CO2 horizontal container, considering installation of high pressure pipes for interconnecting the current process according to project needs.